Quantcast
VISUAL     PERFORMANCE     FILM

In News

Safety of Bay Bridge Called Into Question

Posted by Keith Mizuguchi on May 29, 2012 | Comments (0)

A new report has found that the builder of the Bay Bridge may not have disclosed that part of the concrete making up the foundation had not hardened before it was tested.

The story was published in the Sacramento Bee over the weekend and found “descriptions of the apparent defect in records provided by Caltrans last fall.”

This is just the latest problem for Kiewit-FCI-Manson, which built the foundation to the span. The newspaper also reported on a problematic 2007 test result which “showed that a Caltrans employee skipped required test preparation for separate checks of the foundation and fabricated results on other structures.”

The Bee also found numerous other problems with the piles and gaps in essential data in their investigation, which has led some experts to question whether the new Bay Bridge will be able to withstand an extreme earthquake.

Caltans has maintained that the bridge is safe and can withstand a major quake.

The new Bay Bridge remains on schedule to open by Labor Day, 2013.

Related Posts Plugin for WordPress, Blogger...

It's simple. Keith Mizuguchi loves to write and write and write some more. After taking a hiatus from the journalism business, he has rekindled his passion for writing over the last two years, holding a job as both a web and on-air writer for San Francisco news radio station KCBS. While he enjoys the news business, his true passions are twofold: sports and food. Bay Area born and raised, he lives in San Jose, commutes to SF and loves every minute of it. You can follow his food adventures on Twitter @foodie_keith.


Tags: , , , , , ,

 Email  Print Share


Facebook Comments

Leave a Reply

All comments are sent for moderation before appearing here.